Skip to content
Have Questions? Ask an expert. Call (848) 600-6420
Have Questions? Ask an expert (848) 600-6420
by EG4

EG4 GridBOSS MID | 200A Service Entrance

Original price $2,399.95 - Original price $2,399.95
Original price
$2,399.95
$2,399.95 - $2,399.95
Current price $2,399.95
+ No Sales Tax

Estimated Shipping Widget will be displayed here!

Questions? Ask an Expert
Buy with confidence. Contact our experts today.

EG4 GridBOSS Micro-Grid Interconnection Device (MID)

The EG4 GridBOSS MID streamlines your Energy Storage System (ESS) by combining up to 10 components into one robust unit. It is designed for seamless integration with utilities, generators, inverters, and loads, providing centralized control, straightforward installation, and real-time remote monitoring.

EG4 GridBOSS Key Features

  • One-Point ESS Control: Connect and manage utility, inverters, generator, and loads from a single device.
  • Reduced Complexity: Replace breakers, transfer switches, and more with one compact solution.
  • Smart Load & Power Shedding: Automate power management to optimize battery performance.
  • 200A Service Entrance: Reliable with a 22 kAIC main breaker for powerful service integration.
  • Real-Time Monitoring: Access and adjust settings remotely via the EG4 app or monitoring system website.
  • Configurable Breakers: Supports one generator up to 125A, 3 hybrid inverters up to 90A each, and 4 smart ports ranging from 60A to 125A.


    EG4 GridBOSS MID Specifications

    • Voltage: 120/240VAC
    • Max Current: 200A
    • Hybrid Ports: 3 (up to 90A each)
    • Smart Ports: 4 (up to 125A)
    • Operating Temp: -40°F to 140°F
    • Warranty: 10 years
    • Certifications: UL Certified, compatible with Eaton 200A main breaker model CSR25K

    Each EG4 GridBOSS Includes:

    1. EG4 GridBOSS Micro Grid Interconnection Device
    2. 70A Breaker:
      Compatible only with the EG4 18kPV Hybrid Inverter.
    3. Smart Port Breakers:
      Rated at 30A, 40A, 60A, and 80A.

    Please Note:

    • You must purchase a 90A Breaker (due to ship separately in early December) for use with the EG4 FlexBoss21 Hybrid Inverter.
    • You must purchase a 50A Breaker separately for use with the EG4 12kPV Hybrid Inverter.
    • 125A Breaker (sold separately) can be used with either the Smart Port or Gen Port.
    • In order for the GridBOSS to meet it's UL Certifications copper wire must be used inside the unit. 

    Documents & Downloads

    Order your EG4 GridBOSS MID Today!

    Still Have Questions? Speak with an Expert: (848) 600-6420

      Start Your Free Solar System Design Today!

      Completely free for a limited time ($99 value)! Get started in less than 5 minutes with no strings attached.

      Start Your Free Design

      Lifetime Customer Support

      We provide lifetime personalized support with real humans dedicated to guiding you through installation, troubleshooting, system expansions, and any other problems that may arise. Ensuring a seamless solar experience.

      Questions?

      We've got answers

      Check Out What Our Customers Have to Say

      Order process flawless. Shipping was super fast.

      William Tarolli

      had a bunch of questions and Christian answered them. Now hopefully after using three different inverters this one will have the correct software and will solve the problem.
      Thanks for the help!

      J.C.

      I was a bit skeptical of buying from a new company first and spoke to Christian. He answered all my questions and made sure my order shipped quickly. I would buy from them again anytime, and I recommend them.

      Christopher Moore

      Newsletter

      Invite customers to join your mailing list.

      Compare products

      {"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}

      Select first item to compare

      Select second item to compare

      Select third item to compare

      Compare